Neyshabur City Wastewater Treatment Plant Project

• Location: South side of the old Neyshabur treatment plant • Investment: 18 trillion rials under a counter-sale agreement • Capacity: 40 thousand cubic meters per day • Treatment method: Activated sludge (A2O) • Output quality: Full EPA environmental standards for discharge to the environment and industrial uses • Goal: Increase coverage of sanitary wastewater disposal services from 56% to […]
Mapping operation of the wastewater transmission line route from the Neyshabur city treatment plant to the Khorasan steel complex site

Mapping to transfer wastewater from the Neyshabur city treatment plant to the Khorasan Steel Complex Company to resolve the water crisis at this time in the country.
Connecting a 360,000 cubic meter pool to a 160,000 cubic meter pool

Connecting the 360,000 cubic meter pools to 160,000 cubic meters using a 500 mm polyethylene pipe and constructing a concrete manhole at the connection point to the existing old 500 mm valve. This plan will enable the exploitation of water from the 360,000 cubic meter pool and will significantly resolve the water shortage problem at […]
Video report of the Neyshabur city wastewater treatment plant project
Implementation of the sewage collection network and installation of branches in Neyshabur city (Section 7)

The Neyshabur City Sewerage Collection Network and Branch Installation Project (Section 7) is underway with the aim of developing urban infrastructure, improving public health, and improving water and wastewater resource management. This project includes the implementation of sewage collection lines, installing household branches, and connecting them to the Neyshabur City Sewage Treatment Plant, which plays […]